Tuesday21 January 2025
rating.net.ua

In Kyiv, the repairs to the water pipeline damaged during the missile strike on January 18 have been completed.

Utility workers replaced 9 meters of 700 mm diameter pipeline.
В Киеве завершен ремонт водопровода, поврежденного в результате ракетной атаки 18 января.

Kievvodokanal reported that the company's specialists have completed repairs on the water pipeline that was damaged during Saturday's missile attack in the Shevchenkivskyi district.

A total of 9 meters of 700 mm diameter pipeline were replaced, the excavation was filled in, and the site has been handed over for asphalt paving to the Shevchenkivskyi District Road Maintenance Department.

“Currently, traffic is partially restricted on Yuriy Ilyenko Street,” the statement reads.

We reported that the morning of January 18 in the capital began with explosions, as a result of the attack 3 people lost their lives.

The prosecutor's office showcased the aftermath of the shelling in Kyiv.